Refurbishment and Extension of Sarreliber Building
Year of construction: 2021
Location: Arcos de Valdevez
Owner: SARRELIBER – Transformação de Plásticos e Metais, S.A.
An extension to an industrial unit, which is currently in operation, required compatibility with the operation of this industrial unit. Baltor was responsible for building a covered unloading dock with an overhead crane. In addition to creating a mezzanine floor with office space, we were responsible for all the project’s special installations.
![logo_](https://baltor.pt/wp-content/uploads/2023/09/logo_.png)
Navegação
Página
Página
Página
Página
Navegação
Página
Página
Página
Página
Navegação
Página
Página
Página
Página
Baltor Engenharia e Construção, Lda – Alvará de Construção nº59678-PUB © 2023 Todos os direitos reservados. By Iber Bússola